The GFunnel Methodology
Risk Management Algorithm
The steps
- Identify all named risks across the four pillars. Correctness (process risk), Complexity (handling-edge-case risk), Patience (premature-action risk), Resilience (single-point-of-failure risk).
- Score each risk by probability × impact. Hold both factors as variables until measured — per Variable Principle: do not assume probabilities you have not estimated.
- Apply Layer I.B Texas Grid analysis. What single failure would cascade into systemic collapse? That risk takes priority regardless of its probability.
- Apply Pillar IV (Resilience). For each major risk, define the downgrade path. Per the framework: never fully dependent on any single vendor, platform, person, or assumption.
- Establish observation per Layer I.F. What signals would warn of the risk materializing? Build instrumentation.
- Build mitigation by Fibonacci. Foundation: most likely + most impactful first. Each subsequent mitigation informed by the prior two.
- Document mitigations and their falsifiability conditions. The mitigation that cannot be tested cannot be trusted.
- Review monthly. Risk profiles drift; the dynamic middle of risk-tolerance shifts with conditions.